Modern Logistics Hub
PRJ-04.3 / Industrial

Modern Logistics Hub

IndustrialInfrastructure

Client / Location

Hazira Industrial Zone, Surat

Timeline

2022 — 2023

Status

Completed

Project Overview

High-throughput industrial logistics park with optimized arterial connectivity and topographical grading.
Logistics Hub Frontage
IMG.01Logistics Hub Frontage
Pipeline Utility & Drainage Alignment
IMG.02Pipeline Utility & Drainage Alignment
DGPS Control Point Setup
IMG.03DGPS Control Point Setup
Total Station Field Observations
IMG.04Total Station Field Observations